| Home  Blogs Help Search Login Register  
« previous next »
Pages: [1] Print
Author Topic: Lot of work .......  (Read 6836 times)
hru
Sr. Member
****
Posts: 172


Murena Lover :-)


« on: November 11, 2007, 09:42:51 pm »

So winter is here.
I have started up the renovating/repainting of my murena.

First job was to remove the black rubber band in the front, see attached photos.
500 grams of plastic padding with glass fibre,  a small sealing afterwards and this is the result.

Before that, I had both wings off (no pictures) There was a damage to right inner shielding and I had to completely renew it.
I had both wings off, since they were gaping very diffently to the doors

Still have a long list before going to the paint-job:
- windshield out
- roof off, and glued again
- Interior out
- rear bumper off
- windows out of doors
- repair of right door (fibre work)

I will see if I can remember to post some more :-)

BR
Henrik
Logged

Matra Murena 2.2
davidewanprice
Guest
« Reply #1 on: November 12, 2007, 10:33:00 pm »

Well done on your work. Looks good, Id like to see more photos if you have them
Logged
davidewanprice
Guest
« Reply #2 on: November 14, 2007, 10:05:20 pm »

I need some advice on the roof maybe you can help? please see my thread on removing the roof lining.. Thanks
Logged
Pages: [1] Print 
« previous next »
Jump to: